Modernized block plant
Multi-product precast line with 100% treated water. Existing operating asset generating revenue from year one.
Phase 1Infracircular MX turns the fragmented waste management of a mid-size Mexican city into a phased, bankable industrial circular platform — replicable across the region and aligned with IRIS+, the GHG Protocol and SDGs 7, 9, 11, 12 and 13.
Co-located infrastructure on a single industrial site in El Marqués, with closed material and energy flows between activities. Scaled in phases to unlock institutional climate capital without stranded-asset risk.
Multi-product precast line with 100% treated water. Existing operating asset generating revenue from year one.
Phase 1Crushing and classification of C&D waste into manufactured sand and recycled aggregates.
Phase 1Automated center with NIR optical sorting to recover recyclables and prepare refuse-derived fuel.
Phase 2Thermal valorization of non-recyclable plastics and biomass in oxygen-free conditions.
Phase 3Thermochemical conversion of non-recyclable fractions into syngas as an energy carrier.
Phase 3Electricity and heat from pyrolysis and gasification streams, closing the campus loop.
Phase 3Target capital stack: ~40% senior commercial debt · ~40% concessional / climate funds · ~20% founder equity.
The block plant runs entirely on truck-delivered treated water — zero municipal potable water. Replaces 150–250 L/m³ of concrete and responds directly to Querétaro's structural water stress.
Solid block (12, 14, 15 cm) · Concrete brick 10×14×28 · Hollow block (10, 12, 15, 20 cm) · Floor joist 15×75×20 · Adoquín 8 cm. Housing, public works, industrial and pavement markets.